The Capitol LedgerEvery move in Congress, on the record
HomeBillsRecordsLedger AI

The Capitol Ledger

Built from the Congressional Record and Congress.gov. Every summary links to its source.

AboutFAQFeedbackTerms of ServicePrivacy Policy
Follow us onlineInstagram

Summaries are AI-generated from primary sources. Verify anything important against the original record.

The Capitol Ledger

Built from the Congressional Record and Congress.gov. Every summary links to its source.

The projectAboutFAQFeedback
LegalTerms of ServicePrivacy Policy
Follow us onlineInstagram

Summaries are AI-generated from primary sources. Verify anything important against the original record.

All bills
H.R. 9023·119th Congress·Introduced May 26, 2026

CLEAN UP Mines Act of 2026

IntroducedEnvironmental ProtectionSubstantive
View bill text
Sponsor
Rep. Beyer, Donald S. [D-VA-8]
Committees
Natural Resources Committee (primary)
Last action
May 26, 2026

Bottom line

The CLEAN UP Mines Act of 2026 aims to accelerate and strengthen environmental reclamation and monitoring standards for surface coal mining operations, increasing accountability and potentially operational costs for the industry.

What it actually does

This bill significantly amends the Surface Mining Control and Reclamation Act of 1977 (SMCRA) by imposing stricter timelines for reclamation activities, enhancing environmental monitoring requirements, and modifying the conditions for releasing performance bonds. It mandates that backfilling and grading be completed within 180 days of last coal production and before equipment removal, and sets new deadlines for revegetation. The bill also requires quarterly water monitoring and annual biological assessments of streams, and treats temporary cessation of mining as a significant permit revision.

Proponents argue

Supporters argue that this bill is crucial for preventing long-term environmental damage from surface coal mining by ensuring timely and thorough reclamation. They contend that current regulations allow too much flexibility, leading to abandoned mine lands and ongoing pollution. By setting clear, shorter deadlines and mandating comprehensive monitoring, the bill would protect water quality, restore ecosystems more effectively, and hold operators more accountable for the full lifecycle of their mining activities.

Opponents contend

Opponents might argue that the bill's stringent timelines and increased monitoring requirements impose an undue financial and administrative burden on coal mining operators, potentially leading to job losses and reduced competitiveness for the industry. They may contend that existing regulations are sufficient and that these new requirements could force some operations to close prematurely, especially smaller companies or those facing temporary economic downturns, without necessarily achieving significantly better environmental outcomes.

The bill is concise and directly amends specific sections of existing law, making it relatively accessible for an informed reader to understand its core changes within a reasonable timeframe.

Section 2(a) and 2(c)(1)(A), (G)

Accelerated Backfilling and Grading Deadlines

prominently featuredstraightforward

This provision mandates that all backfilling and grading activities, including ensuring proper drainage control and eliminating highwalls and spoil piles, must be completed within 180 days after the date of last coal production. Furthermore, this work must be finished before the necessary equipment for backfilling and grading is removed from the site. This significantly tightens the timeframe for initial reclamation efforts.

GroupImpactMechanismScale
GroupCoal mining operatorsImpactIncreased operational costs and stricter project management requirementsMechanismMandatory deadlines for reclamation activitiesScaleIndustry-wide
GroupLocal communities and environmentImpactReduced exposure to unreclaimed mine sites and associated pollutionMechanismFaster stabilization and restoration of mined landsScaleRegional

Supporters argue

Supporters argue that these accelerated deadlines are essential to prevent environmental degradation, such as acid mine drainage and soil erosion, that can occur when sites are left unreclaimed for extended periods. They contend that prompt reclamation protects water resources and public safety, and ensures operators fulfill their environmental obligations without delay.

Critics contend

Critics may argue that such rigid deadlines do not account for unforeseen operational challenges, weather delays, or economic fluctuations, making compliance difficult and costly. They might suggest that forcing rapid reclamation could lead to less effective, rushed work or premature site abandonment if operators cannot meet the timelines.

Tradeoffs

The provision balances the environmental benefit of rapid reclamation against the operational flexibility and cost considerations for mining companies. While faster reclamation reduces environmental risk, it could increase immediate financial pressure on operators.

Section 2(b)

Inactive Mine Permit Compliance and Revision

prominently featuredmoderately complex

The bill reclassifies a request to temporarily cease or suspend mining operations as a 'significant permit revision.' Additionally, if a permitted mine has no active coal removal or reclamation for more than six months within any three-year period, its permit is considered out of compliance. To regain compliance, the operator must either meet specific reclamation standards without variances and submit a plan to return to production within one year, or apply for a permit revision.

Section 2(d)

Enhanced Environmental Monitoring Requirements

prominently featuredmoderately complex

This section significantly expands environmental monitoring. It mandates quarterly monitoring of both surface and ground water during mining and reclamation, specifying various monitoring sites including surface drainage, groundwater aquifers, and precipitation. It also requires an annual assessment of the biological condition of streams to track restoration progress and inspections of surface water runoff control structures after significant precipitation events (100-year, 6-hour events).

Section 2(e)

Revised Performance Bond Release Conditions

mentioned in summarymoderately complex

This section amends the conditions for releasing performance bonds held by mining operators. It reduces the initial bond release percentage from 60% to 40% upon completion of backfilling, regrading, and drainage control, linking this release to the new, stricter 180-day deadlines. Subsequent bond releases are also tied to the new revegetation timelines (36 months for establishment, plus one year for successful revegetation).

FOUND

This amendment reduces the percentage of the performance bond that can be released after the initial phase of reclamation (backfilling, regrading, and drainage control) from 60% to 40%.

Section 2(e)(1)(B)

Why it matters:This is a standard legislative practice for amending specific numerical values within existing statutory text. It is not necessarily evasive, but its significance can be missed.

Case for: Supporters would argue that retaining a larger portion of the bond (60% instead of 40%) provides greater financial security for the public and regulatory authorities, ensuring that funds are available for the more complex and longer-term aspects of reclamation, such as revegetation and water quality treatment, should an operator default.

Case against: Critics might argue that reducing the initial bond release percentage significantly impacts the cash flow of mining operators, making it more difficult for them to finance subsequent reclamation phases or other business operations. This could disproportionately affect smaller companies and potentially lead to financial distress.

Estimated impact: This change would result in mining operators having 20% less of their performance bond released after the initial reclamation phase, increasing the capital tied up in financial assurance for a longer duration across all affected permits.

About this analysis. AI-Generated from the official bill text and available committee reports. Gaps in available data are noted explicitly. Verify important details with the official Congress.gov record.

On this page

  • Executive summary
  • Key provisions
  • Buried treasure
  • Follow the money
  • Critical analysis
  • Questions to ask
Ask Ledger AI about this