The Capitol LedgerEvery move in Congress, on the record
HomeBillsRecordsLedger AI

The Capitol Ledger

Built from the Congressional Record and Congress.gov. Every summary links to its source.

AboutFAQFeedbackTerms of ServicePrivacy Policy
Follow us onlineInstagram

Summaries are AI-generated from primary sources. Verify anything important against the original record.

The Capitol Ledger

Built from the Congressional Record and Congress.gov. Every summary links to its source.

The projectAboutFAQFeedback
LegalTerms of ServicePrivacy Policy
Follow us onlineInstagram

Summaries are AI-generated from primary sources. Verify anything important against the original record.

All bills
2 versions
Back to REPORTED TO SENATE
Comparev1INTRODUCED IN SENATEJan 29→v2REPORTED TO SENATEMay 21
SubstantiveINTRODUCED IN SENATE → REPORTED TO SENATE

What changed between these versions

A substantive refinement to the bill's directives on broadband program synchronization. v2 introduces a new requirement for the National Strategy to propose a maximum subsidy amount for broadband deployment, while simultaneously removing a prior mandate for the Implementation Plan to determine a fixed subsidy ceiling for non-technologically neutral programs. Additionally, v2 emphasizes promoting 'safe' access to broadband infrastructure.

Overview

A handful of targeted changes across two key sections of the bill. · v2 refines the approach to federal broadband program synchronization by shifting the responsibility for proposing subsidy caps from a mandatory determination in the implementation plan to a more flexible proposal within the strategy, with explicit consideration for high-cost areas. It also adds a new emphasis on safety for infrastructure access.

The most significant change in v2 is the introduction of a new requirement for the National Strategy to propose a maximum subsidy amount for broadband deployment, explicitly allowing for consideration of high-cost and Tribal areas. Concurrently, v2 removes a previous mandate for the Implementation Plan to determine a fixed subsidy ceiling for non-technologically neutral programs. Furthermore, v2 adds the word 'safe' when referring to the promotion of access to broadband infrastructure. These changes collectively adjust the framework for how federal broadband funding efficiency and deployment are planned.

+

Major additions

+
Section 3(b)(13) (new)

This new paragraph requires the National Strategy to propose a maximum amount for a subsidy or funding award to provide broadband internet access service to a single location. Crucially, it also mandates that this proposal allow for consideration of high-cost areas, including high-cost Tribal areas.

This addition introduces a new, specific policy directive for the National Strategy, aiming to control costs and ensure efficient use of funds while providing flexibility for challenging deployment environments. It acknowledges the unique economic realities of high-cost and Tribal regions, which is a significant consideration for equitable broadband deployment.

−

Deletions

−
Section 4(b)(3)

This provision in v1 required the Implementation Plan to determine a ceiling on the amount of a subsidy or funding award for broadband internet access service to a single location, specifically for Federal broadband programs that are not technologically neutral. This ceiling was to be consistently applied and adopted by all covered agencies for infrastructure funding.

The deletion removes a mandatory, universal subsidy ceiling requirement from the Implementation Plan, particularly for non-technologically neutral programs. This grants covered agencies more flexibility in their funding decisions and removes a potentially rigid cost-control measure, aligning with the new, more flexible proposal for a maximum amount in the Strategy (Section 3(b)(13) in v2).

~

Modifications

~
Section 3(b)(9)(D)
The word 'safe' was inserted to qualify the type of access to infrastructure and rights of way that should be promoted.

This modification emphasizes safety as an explicit consideration when promoting access to infrastructure for broadband deployment. This could lead to the inclusion of safety standards, guidelines, or additional review processes in the recommended incentives and actions, potentially impacting the planning, cost, or timeline of broadband infrastructure projects.

Before

v1 recommended incentives and actions to help State, local, and Tribal governments promote access to infrastructure or rights of way necessary for deployment of broadband internet access service, whether privately or government owned or cooperatively organized.

After

v2 recommends incentives and actions to help State, local, and Tribal governments promote 'the safe' access to infrastructure or rights of way necessary for deployment of broadband internet access service, whether privately or government owned or cooperatively organized.

Scope

Meaningful expansion or narrowing — The changes are concentrated in specific subsections within the requirements for the National Strategy (Section 3(b)) and the Implementation Plan (Section 4(b)). — v2 represents a refinement in policy direction regarding the approach to broadband subsidy caps and infrastructure access. It shifts from a mandatory, universal ceiling determination in the implementation phase to a more flexible proposal within the strategy, with explicit consideration for high-cost areas. It also introduces a new emphasis on safety in infrastructure access. — The deletion of Section 4(b)(3) in v1 and the addition of Section 3(b)(13) in v2 demonstrate a direct interaction, indicating a revised approach to how subsidy caps are to be addressed within the overall strategy and implementation framework. The modification to Section 3(b)(9)(D) adds a new qualitative element to infrastructure access.

Impact analysis

Assistant Secretary of Commerce for Communications and Information (NTIA)

Procedural change, shifting from a mandatory determination to a more flexible proposal, and adding a new specific element to the Strategy's requirements.

The Assistant Secretary's mandate for developing the National Strategy now includes proposing a maximum subsidy amount for broadband deployment, with explicit consideration for high-cost and Tribal areas. Concurrently, the requirement to determine a fixed ceiling in the Implementation Plan has been removed.

Covered federal agencies administering broadband programs

Increased flexibility in funding mechanisms and potentially more nuanced project funding.

These agencies will no longer be subject to a mandatory, consistently applied subsidy ceiling determined by the Implementation Plan for non-technologically neutral programs. Instead, they will operate under a proposed maximum amount from the Strategy that allows for consideration of high-cost areas.

State, local, and Tribal governments, and broadband service providers

Procedural change (safety emphasis) and potential benefit (more adaptable funding for high-cost areas).

The promotion of access to infrastructure and rights of way now explicitly includes a 'safe' aspect, which may introduce additional safety-related requirements or considerations in permitting and access processes. The shift in subsidy cap policy may lead to more flexible funding opportunities in high-cost areas, potentially benefiting deployment in those regions.

Ask Ledger AI about this